Attivo Trail Expansion Project for Haverkamp Construction

Kinzler Construction Services partnered with Haverkamp Construction to provide high-performance insulation solutions for the Attivo Trail multi-phase expansion commercial insulation project. This development consists of three major phases, with the original building completed in 2022, the second phase completed between 2024–2025, and the current third phase underway for 2025–2026. The third phase represents a second major addition to the original structure, continuing the growth of this large-scale commercial facility.

Our team is delivering a comprehensive insulation package designed to maximize energy efficiency, air sealing performance, and occupant comfort across all levels of the building.

Scope of Work

Roof & Structural Transitions

  • Applied 3″ of closed-cell spray foam at roof truss ends on the 3rd floor.
  • Applied 3″ of closed-cell spray foam at rim joists on the 2nd and 1st floors.
  • This assembly provides superior air sealing, moisture control, and thermal performance at critical transition areas.

Exterior Walls

  • Performed full air sealing, including caulking and can-foam application at cracks and around windows and doors.
  • Installed R-21 fiberglass batt insulation with vapor barrier to ensure thermal efficiency and moisture control throughout the exterior envelope.

Interior Walls

  • Installed R-19 fiberglass batt insulation to improve sound control and thermal separation between interior spaces.

Mid-Floor Assemblies (1st & 2nd Floors)

  • Installed netting and dense-packed blown-in fiberglass insulation to fully insulate the mid-floor assemblies, enhancing both thermal performance and sound attenuation between floors.

Project Scale & Production

  • This phase of the building consists of approximately 23,000 square feet per floor.
  • Our team completes one full floor in just 5 days, demonstrating efficient project execution while maintaining high quality standards.

Project Outcome

Kinzler Construction Services is delivering a high-performance, air-tight, and energy-efficient insulation system for the Attivo Trail expansion. Through a strategic combination of closed-cell spray foam, fiberglass batts, and blown-in insulation, this project will achieve long-term durability, improved occupant comfort, and reduced energy costs. This multi-phase commercial insulation project highlights Kinzler’s capability to support large-scale commercial developments with consistent quality and efficient execution.

Location:
Ankeny, IA
Builder:
Haverkamp Construction
Installed:
Spray Foam, Fiberglass, Blown-In

Kinzler Construction Services White Logo

NEED HELP?

Call (888) 292-2382

FIND A BRANCH

Search for Your Local Branch

Copyright © 2025 | Kinzler Construction Services – A Kinzler Corporation Family & Employee-Owned Company | All Rights Reserved | Privacy Policy