Triview Admin Building Insulation Project

Kinzler Construction Services partnered with Crossland Construction to deliver high performance insulation for the Triview Admin Building in Monument, CO. Our Denver team provided high-performance spray foam and fiberglass batt insulation solutions throughout the building, ensuring thermal efficiency, fire safety compliance, and durability for both office and parking areas.

Scope of Work

Roof & Upper Assembly

  • Applied 7″ closed-cell spray foam (JM GEN IV) to all roof deck areas.
  • Followed with No-Burn Plus THB for fire protection compliance.
  • Assembly designed for optimal energy efficiency and long-term performance.

Exterior Walls

  • Installed R-21 Kraft-faced batt insulation, providing consistent thermal resistance and moisture control.

Interior Walls

  • Installed R-19 and R-11 unfaced batts, enhancing acoustic separation and thermal performance within office spaces.

Parking Garage

  • Sprayed foam insulation applied to parking garage ceilings and surfaces, left exposed per project design requirements.
  • Installed firestop systems along garage/office fire partition walls to maintain code compliance and safety.

Project Outcome

The Denver team delivered a code-compliant, energy-efficient commercial insulation project for the Triview Admin Building. By combining spray foam and batt insulation, we ensured superior thermal performance, acoustic separation, and fire protection, highlighting Kinzler Construction’s expertise in Monument, CO commercial insulation solutions.

Location:
Monument, CO
Builder:
Crossland Construction
Installed:
Spray Foam, Fiberglass

Kinzler Construction Services White Logo

NEED HELP?

Call (888) 292-2382

FIND A BRANCH

Search for Your Local Branch

Copyright © 2025 | Kinzler Construction Services – A Kinzler Corporation Family & Employee-Owned Company | All Rights Reserved | Privacy Policy